| MOQ.: | 1 পিসি |
| মূল্য: | Negotiated price |
| স্ট্যান্ডার্ড প্যাকিং: | কাঠের |
| বিতরণ সময়কাল: | 1-7 দিন |
| অর্থ প্রদানের পদ্ধতি: | টি/টি, ওয়েস্টার্ন ইউনিয়ন, পেপ্যাল |
| সরবরাহ ক্ষমতা: | প্রতি মাসে 500 টুকরা |
The travel gearbox is a critical component in an excavator's undercarriage system, responsible for transmitting power from the hydraulic motor to the tracks or wheels, enabling precise movement and heavy-duty operation. Its reliability directly impacts the machine's productivity in mining, construction, and earthmoving applications.
| Application | Excavator |
| Part Name | Excavator Travel Gearbox |
| Model | ZX60 |
| Part Number | 9111062 363-9337 |
| MOQ | 1 PC |
| Warranty | 12 Months |
| Payment Terms | T/T, LC, PayPal |
| Delivery | 3 Days After Payment Received |
| Shipment | By Sea, By Air, By Express or as Required |
During maintenance, regularly check the oil level and oil quality to avoid gear sintering caused by oil shortage or contamination. Replace seals every 2000 hours to prevent leakage failures.
| MOQ.: | 1 পিসি |
| মূল্য: | Negotiated price |
| স্ট্যান্ডার্ড প্যাকিং: | কাঠের |
| বিতরণ সময়কাল: | 1-7 দিন |
| অর্থ প্রদানের পদ্ধতি: | টি/টি, ওয়েস্টার্ন ইউনিয়ন, পেপ্যাল |
| সরবরাহ ক্ষমতা: | প্রতি মাসে 500 টুকরা |
The travel gearbox is a critical component in an excavator's undercarriage system, responsible for transmitting power from the hydraulic motor to the tracks or wheels, enabling precise movement and heavy-duty operation. Its reliability directly impacts the machine's productivity in mining, construction, and earthmoving applications.
| Application | Excavator |
| Part Name | Excavator Travel Gearbox |
| Model | ZX60 |
| Part Number | 9111062 363-9337 |
| MOQ | 1 PC |
| Warranty | 12 Months |
| Payment Terms | T/T, LC, PayPal |
| Delivery | 3 Days After Payment Received |
| Shipment | By Sea, By Air, By Express or as Required |
During maintenance, regularly check the oil level and oil quality to avoid gear sintering caused by oil shortage or contamination. Replace seals every 2000 hours to prevent leakage failures.